Systematic and systematized reviews

Systematic vs. Systematized

A systematic review is a highly structured, transparent and methodical approach to synthesizing existing research on a specific question or topic. It aims to minimize bias and ensure reproducibility.

  • Systematic reviews begin with a clearly defined research question and follow predefined protocols (often registered in advance).
  • The search strategy aims to be comprehensive, and systematically explores multiple databases | resources, including grey literature.
  • The process of screening studies and critical appraisal should be carried out independently by at least two researchers to minimize selection bias and ensure consistency.
  • The systematic review requires detailed and transparent documentation of
    • the search process;
    • inclusion and exclusion criteria;
    • study selection;
    • data extraction methods.

Although initially developed to address clinical or policy-related questions, systematic reviews have recently been increasingly adopted in various other research fields.

Other systematized approaches to review (rapid review, scoping review...) follow many of the procedures of a systematic review, but are not as rigorous. They may be less comprehensive or omit some steps, such as quality assessment and are often used when a systematic review is not feasible due to time or resource constraints.

Types of reviews

Different approaches to literature reviews include narrative reviews for summarizing existing knowledge, systematic reviews for comprehensive and unbiased synthesis, scoping reviews to explore the breadth of a topic, and meta-analyses to statistically combine results from multiple studies.

Type

Characteristics

Narrative reviews

  • not-systematized;
  • focus on summarizing and interpreting existing knowledge;
  • typically without a formal methodology;
  • offer flexibility but less transparency.

Systematic reviews

  • most rigorous;
  • follow strict protocols to locate, assess, and synthesize all relevant studies on a defined topic;
  • often include a meta-analysis to combine quantitative data.

Rapid reviews

  • streamline the systematic review process by limiting the breadth or depth of the search and appraisal to provide timely evidence for decision-making;
  • greater risk of bias.

Scoping reviews

  • broader scope;
  • map the key concepts and types of evidence available;
  • do not necessarily assess the quality of the included studies;
  • greater risk of bias.

Umbrella reviews (or reviews of reviews)

  • compile evidence from multiple systematic reviews;
  • often used in fields with abundant literature, to synthesize the broader findings from multiple related studies. 

Each approach serves different research objectives, balancing thoroughness, depth, and time constraints. This article provides a clear overview of 14 types of literature reviews, including systematic reviews and systematized reviews, along with any (dis)advantages.

The Right Review tool can help you identify the most suitable type of review for your needs.

 

Source | https://libguides.csu.edu.au/systematicreviews

Search approaches

Systematized reviews can also be classified according to the starting point of the search strategy. There are four main approaches:

Approach

Characteristics

Advantages

Disadvantages

Journal-driven

  • focus on predefined, often well-regarded, journals
  • use predefined set of keywords
  • transparent search process
  • potentially less comprehensive coverage

Database-driven

  • search one or multiple electronic databases
  • use predefined keywords
  • potentially more comprehensive
  • fosters identification of less-known items
  • transparent reporting of the search process can become tedious
  • screening is laborious

Seminal-work-driven

  • identify seminal work(s)
  • screen citations (backward and forward snowballing)
  • fosters coverage of main research stream
  • potentially less transparent
  • potentially less comprehensive

Combined

  • combine elements of the other three approaches
  • balances strengths of other approaches, while minimizing individual weaknesses
  • labor-intensive search and screening process

Systematic reviews | Process

Planning and conducting systematic reviews is a labour-intensive and time-consuming process. The review procedure usually takes at least twelve months to complete before the report can be submitted to a journal and generally involves the following steps:

 

Source | https://libguides.cam.ac.uk/

 


The indicative timeline in the Cochrane Handbook (version 5.1.0)  allocates (a minimum of) 2 months for developing the protocol—including search strategies, eligibility criteria, and methodology, and 8 months for locating published and unpublished studies, conducting various screenings, and performing the analysis.

 

Gantt

Source | https://www.cochrane.org

 

However, the actual timeframe of systematic reviews can vary significantly depending on the nature of the topic, the volume of studies that need to be screened and analyzed, etc.

Basic guidance

Research question

A well-defined research question should be specific, clear, and answerable based on the studies included in your review.  Often, fixed frameworks can be used to structure the question effectively. Examples are:  PICO and SPIDER 

PICO (often used for clinical reviews)

E.g. 'What is the effectiveness of cognitive-behavioral therapy (CBT) compared to medication in reducing symptoms of anxiety in adults?'

  • P (Population): Adults;
  • I (Intervention): CBT;
  • C (Comparison): Medication;
  • O (Outcome): Reducing symptoms of anxiety.

SPIDER (often used for qualitative reviews) 

E.g. 'How do women who have experienced domestic violence perceive the effectiveness of support groups in improving their well-being?'

  • S (Sample): Women who have experienced domestic violence;
  • PI (Phenomenon of Interest): Perceptions of support group effectiveness;
  • D (Design): Qualitative interviews or case studies;
  • E (Evaluation): Improvement in well-being;
  • R (Research Type): Qualitative.

Protocol

Predefining the protocol ensures that the review is conducted systematically and consistently, minimizing subjective decisions during the process. It involves clearly outlining the objectives, methodology, and criteria for conducting the review before it begins.

This includes specifying:

  • the research question;
  • inclusion and exclusion criteria;
  • search strategies;
  • data extraction methods;
  • the process for analyzing and synthesizing the evidence.

A checklist for systematic review protocols (PRISMA-P) is available at the PRISMA portal.

Registering the protocol in a publicly accessible database, like PROSPERO, allows others to assess the rigor of the review and helps avoid duplication of research efforts. 

Inclusion and exclusion criteria

Inclusion | exclusion criteria help narrow the scope by ruling out studies that do not meet methodological standards or are published in non-academic sources, such as opinion pieces or grey literature with insufficient data. These parameters can relate to the subject matter of the studies or methodological and/or quality aspects.

Content criteria are directly related to the review's focus and include PICO or SPIDER elements such as

  • population characteristics;
  • intervention type;
  • comparison;
  • outcomes measured;
  • study design;
  • methodology.

Examples of non-content criteria:

  • Language;
  • Publication date range;
  • Publication type (e.g. considering only peer-reviewed articles or excluding conference abstracts);
  • Quality or risk of bias (e.g. assessing the methodological quality of studies using tools like the Cochrane Risk of Bias tool).

Clearly defining inclusion and exclusion criteria upfront helps to avoid bias, ensures transparency, and maintains the replicability of the review process.

Search strategy

Identify key databases relevant to your topic and construct a search string using relevant keywords, Boolean operators, and database-specific filters.

While the Discovery Service (the search bar on the University Library homepage) allows you to search many important databases simultaneously, it is not the best choice for subject-specific reviews that require a high level of detail and transparency in reporting.

It is advisable to search each database individually through its own interface. You can find an overview of the digital resources available through UHasselt in the e-sources list.

Document your searches

Make sure to document the search process carefully, including

  • the search string used;
  • any filters applied;
  • the number of results.

 

  • The PRISMA 2020 flow diagram is a useful tool to document results throughout the search and screening process.
  • The 'save search' and 'save results' features in databases can help you keep track of this information accurately.
  • 'Search alerts' can help you keep the results up-to-date throughout the search process.

Controlled vocabularies

Controlled vocabularies are standardized sets of terms, used to index and categorize articles consistently across databases, e.g. MeSH (Medical Subject Headings) in PubMed and Thesaurus Terms in databases like ProQuest or ERIC.

By utilizing these pre-defined terms, researchers can avoid the pitfalls of keyword variations or synonyms that may miss relevant studies. Controlled vocabularies ensure that related articles are grouped together, even if the authors use different terminology.

Snowballing

You can expand the scope of your literature review by identifying additional relevant studies from the references of the papers you have already found.

Two key approaches:

  • backward snowballing: examine the reference lists of selected articles to discover earlier works that may be relevant.
  • forward snowballing: use citation tracking tools (like Web of Science or the citation data in Discovery Service results) to identify later studies that have cited the paper in question.

This process helps uncover studies that might not have appeared in your initial database searches, especially in cases where terminology varies or relevant works are published in lesser-known journals. 

Intermezzo: Converting PubMed queries to Web of Science and Scopus

PubMed, Web of Science (WoS), and Scopus are key databases for systematic literature reviews in the field of medicine. While PubMed heavily relies on MeSH (Medical Subject Headings) and field-specific queries like [tiab] (title/abstract), WoS and Scopus use keyword-based searching without controlled vocabularies like MeSH. Translating queries from PubMed to these platforms requires careful attention to differences in syntax, search functionalities, and indexing systems.

Problem: MeSH Terms Are Unique to PubMed: WoS and Scopus do not use controlled vocabularies like MeSH.

Solution: Expand MeSH terms into synonyms and related terms for

Step 1: Analyze the PubMed Query

Break Down the Query Components:

  • Identify MeSH terms, free-text terms, Boolean operators (AND, OR, NOT), and filters.
  • Note the [tiab] or field-specific qualifiers used in PubMed.
    ! When building a PubMed query, combining MeSH terms with free-text searches in Title/Abstract (tiab) can enhance retrieval by including both indexed and non-indexed articles. MeSH terms provide precise retrieval for indexed literature, while free-text searches ensure coverage of recent or non-indexed articles. To capture the complexity of MeSH terms in free-text searches, it is essential to include synonyms, related terms, and common variations. For example:

    ("Myocardial Infarction"[MeSH] OR "myocardial infarction"[tiab] OR "heart attack"[tiab] OR "cardiac infarction"[tiab])

    This approach accommodates differences in terminology used by authors, ensuring that articles using alternative or layman terms are not missed.

  • Understand MeSH Terms:
    • MeSH terms are PubMed’s controlled vocabulary for indexing articles. These do not directly translate to Web of Science or Scopus.
      Example: In PubMed, "Myocardial Infarction"[Mesh] retrieves articles indexed under this term. This means that PubMed will also find articles that do not contain this exact term, but synonyms or related terms. This is not automatically the case in WoS and Scopus.

Step 2: Convert MeSH Terms to Keywords

Expand MeSH Terms:

  • Visit the MeSH Browser  to identify the MeSH hierarchy and entry terms.

  • Include synonyms, narrower terms, and related terms.
    Example: For "Myocardial Infarction"[Mesh], add synonyms like "heart attack", "cardiovascular stroke" and "*cardiac infarction."

 

Adapt for Free-Text Search:

  • Combine MeSH terms with free-text keywords:
    ("Myocardial Infarction" OR "heart attack" OR "cardiovascular stroke" OR "cardiac infarction")
  • Adjust for Phrase Searches:
    Use double quotes for exact phrases in both Web of Science and Scopus.

Step 3: Address Field-Specific Qualifiers ([tiab])

PubMed’s [tiab]:

Limits searches to the title and abstract fields.
Example: "diabetes"[tiab] retrieves articles with "diabetes" in the title or abstract.

Translate [tiab] to Scopus and WoS:

  • In Scopus, use TITLE-ABS (title and abstract).
  • In WoS, use TS= (topic search, covering title, abstract, and keywords).
  • Example Translation:
    • PubMed: "diabetes"[tiab]
    • Scopus: TITLE-ABS("diabetes")
    • WoS: TS=("diabetes")

Step 4: Translate Boolean Logic and Syntax

Boolean Operators: All three platforms support AND, OR, and NOT. Ensure operators are in uppercase.

Parentheses and Nesting: Maintain proper use of parentheses to group terms.

Example: ("diabetes" OR "high blood sugar") AND ("treatment" OR "management")

Truncation and Wildcards:

  • PubMed uses * for truncation, but Web of Science and Scopus also support * with slight differences.

Proximity Operators:

The NEAR operator is a powerful tool for conducting proximity searches in databases like PubMed, Web of Science (WoS), and Scopus. It allows users to find terms that occur within a specific number of words from each other, enhancing the precision of search results by capturing contextually related terms.

  • In PubMed proximity search helps locate terms within a specified number of words of each other in titles or abstracts.
    Use the syntax "terms"[field:~N], where N is the word gap, and field is e.g. [tiab].
    Example: "hip pain"[tiab:~2] retrieves phrases like "hip pain" or "pain in right hip."
  • Web of Science explicitly supports NEAR with syntax such as NEAR/x, where x defines the maximum number of words separating the terms. For instance, cancer NEAR/3 therapy retrieves results where "cancer" and "therapy" are within three words of each other in any order. 
  • Scopus supports the W/n operator (e.g., W/3), which functions like NEAR/x in WoS, enabling detailed and efficient proximity searches.

Utilizing these operators can significantly improve the relevancy of literature searches, especially for complex queries where the relationship between terms is critical.

Note: In some databases, such as Web of Science, it is possible to use wildcards (*, ?) within an exact phrase search (enclosed in " "). However, this does not apply to all platforms. Always test if using truncation symbols within quotation marks yields results, as this may unintentionally limit your search.

Step 5: Adapt Filters and Limits

Step 6: Validate and Refine the Search

Check Search Results:

Compare results from PubMed, Scopus, and WoS to ensure consistency.

If discrepancies occur, adjust the query or expand the keywords.

Test Iteratively:

Add or refine terms as needed to capture relevant studies.

 

 

Screening

Title | Abstract screening

At this stage, the elimination process focuses on core aspects that can be easily identified. The goal is quickly ruling out irrelevant studies while retaining those that might potentially meet the review's scope.

Titles and abstracts often provide only a limited amount of information, so decisions are preferably conservative, leaning towards retaining studies for further evaluation during the full-text screening phase.

Full text screening

This stage allows for a deeper assessment of whether a study fully aligns with the systematic review’s research question and the predefined inclusion and exclusion criteria.

Full-text screening also checks for methodological quality, like study design robustness, adequate sample sizes, and completeness of data reporting, thereby maintaining the integrity and validity of the review's findings.

Eliminating duplicates

When conducting a systematic review using multiple databases, it is common to encounter duplicate records, as the same studies may be indexed in more than one source.

To ensure efficiency and accuracy, it is crucial to identify and remove duplicates early in the process. Duplicate studies can skew the analysis and synthesis by inadvertently over-representing certain findings.

Many reference management tools, such as EndNote, Zotero, or specialized software like Covidence, have built-in features to detect and eliminate duplicates.

Full text retrieval

After the initial title and abstract screening, you will retrieve the full text of the remaining results.

Many bibliographic databases available at UHasselt have been equipped with link resolvers, allowing you to directly access the electronic version of a reference (if available through UHasselt) or providing alternative options for obtaining the publication, such as through interlibrary loan.

Additionally, the University Library has a subscription to LibKey Nomad, an extension that can be easily installed in your browser, providing quick and direct access to the scientific articles licensed by Hasselt University.

If you use bibliographic software for your systematic review, you can choose to store the PDFs within the tool.

After retrieval, the remaining articles are screened for close alignment with the research question and predetermined inclusion and exclusion criteria. 

 

Appraisal

Evaluating the results in a systematic review is a critical step that involves assessing the quality, relevance, and impact of the included studies. This process typically begins with a thorough critical appraisal.

Systematically examine the quality of each included study for methodological rigor, potential bias, and reliability using standardized critical appraisal tools like:

Extraction | Synthesis | Reporting

Extract key data from the selected studies, such as author details, study design, sample size, and main findings. Use a pre-defined data extraction form to ensure consistency.

Organize and synthesize the data. Depending on the nature of your research, this could include qualitative synthesis, quantitative meta-analysis, or narrative synthesis.

In the reporting of a systematic review, several essential elements are required to ensure transparency, replicability, and comprehensiveness.

The PRISMA checklist is the most commonly used tool for ensuring that all critical elements are reported. PRISMA provides

  • a 27-item checklist that covers each section of the systematic review; 
  • a flow diagram to guide authors through the process of transparent. and complete reporting.

By adhering to PRISMA guidelines, systematic reviews achieve a high standard of rigor and transparency.

 

Reviews with impact

Many literature reviews are technically well-executed but lack impact because they fail to focus sufficiently on relevance, originality, and audience needs.

Tips for impactful reviews

  • Clear purpose and audience: Define the purpose of your review and tailor it to the needs of your readers.
  • Choose a relevant topic: Focus on significant, unresolved, or unclear issues and avoid overly broad or less relevant topics.
  • Ask strong research questions: Formulate analytical and innovative questions that make a concrete contribution to the field.
  • Adapt your approach: Critically synthesize in established fields and uncover gaps or new directions in emerging domains.
  • Provide practical insights: Deliver actionable advice that is useful in practice and aids decision-making.
  • Cultivate key skills: Enhance the quality of your review with creativity, critical thinking, and collaboration with experts.
  • Select the right journal: Publish in a journal that aligns with your topic and intended audience.

You can create a lasting impact with your review by combining technical quality with relevance and creativity.

Source | Van Riel and Snyder (2024). Enhancing the impact of literature reviews: guidelines for making meaningful contributions.

Useful resources

Handbooks & Manuals

Online

  • Cochrane Handbook for Systematic Reviews of Interventions: This handbook is considered the gold standard for conducting systematic reviews, particularly in healthcare. It provides detailed guidance on each step of the systematic review process, from protocol development to data analysis.
  • PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses): The PRISMA guidelines are widely adopted for reporting systematic reviews and meta-analyses. The website also offers resources for researchers to ensure transparency and reproducibility.
  • JBI (Joanna Briggs Institute) Manual for Evidence Synthesis: The JBI manual offers guidance on conducting systematic reviews across various types of evidence. 
  • Centre for Reviews and Dissemination (CRD) Guidance: The CRD offers in-depth guides for undertaking systematic reviews in areas such as healthcare and public policy. The website also provides tools and checklists for researchers.

Digitally accessible via UHasselt

Available in our physical collection

Checklists & Flowcharts

Checklists and flowcharts are valuable tools for guiding the systematic review process, ensuring that each stage is followed rigorously. Here are some commonly used checklists and flowcharts for systematic reviews:

  • PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses): PRISMA provides a 27-item checklist to ensure transparency in reporting systematic reviews and meta-analyses. The flowchart helps map out the number of records identified, screened, and included in the final analysis.
  • Joanna Briggs Institute (JBI) Critical Appraisal Checklists:JBI provides specific checklists for appraising different types of studies (e.g., qualitative studies, randomized trials). 
  • AMSTAR 2 (A MeaSurement Tool to Assess Systematic Reviews): a tool to appraise the methodological quality of systematic reviews, particularly those involving randomized or non-randomized studies.
  • CASP checklists: widely used in evidence-based practice to ensure the quality and reliability of studies included in reviews and to guide decision-making based on the strength of the evidence.
  • The ROBIS checklist is a valuable tool for checking bias in systematic reviews (primarily tailored to medicine and nursing, but broadly applicable to other fields as well).
  • Campbell EGM reporting standards: outlines the standards for reporting Evidence and Gap Maps, which are tools used to visually represent the evidence landscape on a specific topic. 

Tools & Software

The use of software and tools leveraging machine learning algorithms and text-mining techniques to help manage large volumes of data in order to automate aspects of systematic reviews, such as screening, data extraction, and synthesis, can significantly streamline the process and reduce time and effort. 

However, automation is not without risks, such as the possibility of overlooking nuanced details that require (human) expert judgment. Moreover, it is essential to maintain transparency throughout the process, explicitly documenting in the protocol or report the use of tools, the criteria for their application, and any decisions influenced by automated methods. 

Free

  • Rayyan (with optional paid premium features): designed to help researchers collaborate on screening literature for systematic reviews. It enables rapid title and abstract screening, coding, and labeling of studies for inclusion or exclusion.
    Caveats: Limited to the screening process; it doesn't assist with later stages like data extraction or synthesis. The learning curve for customization may be steep for new users.
  • Abstrackr (with registration): uses machine learning to assist in the abstract screening phase of systematic reviews. It learns from your inclusion and exclusion decisions to predict and suggest relevant abstracts for inclusion.
    Caveats: Limited to abstract screening; does not handle later stages of the review process such as full-text screening or data extraction. Requires manual verification of AI suggestions, as predictions may not be fully accurate.
  • SRDR+ (with registration): free platform for extracting, archiving, and sharing data during systematic reviews and accessing shared data related to systematic reviews.
  • RobotReviewer: uses machine learning to automatically assess the risk of bias in randomized controlled trial. Generates risk-of-bias tables and summaries.
    Caveats: Installation required. Focused only on risk-of-bias assessment; does not assist with other systematic review steps. Requires human oversight.
  • SRA Helper (open-source): set of R packages designed to facilitate systematic reviews and meta-analyses in R. Automates various steps in the review process, such as importing references, conducting meta-analyses, and generating PRISMA diagrams.
    Caveats: requires knowledge of R programming.
  • SR-Accelerator: set of free tools to speed up the systematic review process, including reference de-duplication, automated text extraction, and a keyword highlighting tool to aid in title and abstract screening.
  • RevMan (with registration): developed by Cochrane, RevMan helps with the writing of systematic reviews and meta-analyses. It includes tools for data analysis, risk-of-bias tables, and generating forest plots. Caveats: Primarily suited for healthcare fields and may not be ideal for systematic reviews in other disciplines.
  • Elicit (free basic tier): assists in literature reviews, provides relevant studies, and helps structure systematic reviews by automating part of the review process.
    Caveats: does not handle in-depth data extraction or meta-analyses. Limited database access compared to more specialized tools.
  • Colandr (open-source): AI-assisted tool for conducting systematic reviews. It helps with study screening, full-text review, and data extraction. Caveats: Requires manual verification of AI-suggested inclusion/exclusion decisions. Limited to the study screening process.

Paid subscription

  • Covidence: facilitates every step of the systematic review process, from importing references, screening, full-text review, data extraction, and PRISMA flow diagram generation.
  • EPPI-Reviewer: supports all aspects of systematic reviews, including study management, coding, and advanced text mining using machine learning. It has features for meta-analysis and qualitative synthesis. 
    Caveats: Complex interface with a learning curve for users unfamiliar with text mining or machine learning techniques.
  • DistillerSR: supports reference management, screening, data extraction, and reporting. Offers features for collaboration, PRISMA flowchart generation, and audit trails to track decision-making. Caveats: High cost. Advanced features may require training to utilize fully.
  • JBI SUMARI: supports review protocols, study appraisal, data extraction, and meta-analyses. Designed for rigorous systematic reviews.

Pubmed en MeSH

  • MeSH Browser: tree structures for MeSH-terms and underlying search terms.
  • MeSH on demand: MeSH-terms and free search terms starting from Pubmed ID's of relevant articles. 
  • MeSH analyzer: MeSH-terms and free search terms starting from a research abstract.

Websites, Library guides, & Webinars

  • Campbell Collaboration: a resource focused on social sciences, offering systematic reviews and protocols in education, crime and justice, and social welfare.
  • PROSPERO (International Prospective Register of Systematic Reviews): register your systematic review protocol, which helps avoid duplication and increases transparency.
  • Clarivate's Systematic Review Tips: practical advice for systematic reviews such as refining search strategies, managing references, using specialized databases, and ensuring comprehensive literature coverage. 

Library guides

  • AUB Library Guide: detailed instructions on conducting systematic reviews, with a focus on developing search strategies, managing references, and evaluating evidence. It also provides links to useful tools and databases for effective literature searches.
  • Cambridge Systematic Reviews LibGuide: detailed guide to the systematic review process, from defining research questions to synthesizing and reporting results. 
  • Harvard Meta-Analysis Guide: in-depth overview of the meta-analysis process. It offers resources on selecting appropriate databases, developing search strategies, and using software tools for data synthesis. 
  • Johns Hopkins Systematic Reviews and Other Expert Reviews: guidance on conducting systematic reviews, including formulating research questions, designing search strategies, and managing the review process. 
  • UCL Library Guide for Systematic Reviews: comprehensive resources on the systematic review process, covering everything from formulating research questions to data synthesis and reporting. It includes guidance on selecting databases, search strategies, and tools to ensure rigorous and reproducible reviews.
  • The University of Hawaii's Health Sciences Library guide on systematic reviews: provides comprehensive resources for conducting systematic reviews, including guidance on formulating research questions, database searching, and managing references.

Webinars

  • Elsevier's Researcher Academy: comprehensive introduction to systematic reviews, covering the basics of planning, conducting, and writing systematic reviews. 
  • UCL Library Systematic Reviews Webinar Series: offers step-by-step guidance on key aspects of conducting systematic reviews, including developing research questions, designing search strategies, screening studies, and synthesizing evidence. 

Guides for (systematic) literature reviews

More information

The University Library offers specialized workshops and training upon request, along with personalized support. Topics may include best practices for literature search strategies, systematic review methodologies, selection of databases, and reference management.

   

Dirk Schoenaers

Location:
Campusbibliotheek Diepenbeek